Monday 3 January 2011

Production Schedule - SECOND FILM!


this is the second production schedule for the second short film:


Production schedule

November:
Week of 8/11/10

Planning
Includes:
·        -  Storyboard
·       -   Shot list
·       -   Synopsis

Filming:  (Sam’s House, one location)
From 12pm (preparation of filming)

-         -  Setting up camera
-          - Testing chosen shots (e.g. focus)
-          - Finalising details of filming
-          - Preparing props, area for filming

2pm onwards
-          -Filming shots mentioned on shot list
-          - Film extra shots if needed or wanted
-          - Watch over footage to clarify if all footage has been gained
(Hopefully finished between 4-5pm)

Editing:
11/11/10 until end of term
-          -Log and capture
-          -Name clips
-          -Organise into order (chronological)
-          -Review clips
-          -Create timeline
-          -Add effects, cut effectively
-          -Add music, titles, etc

No comments:

Post a Comment